TRAINING PROGRAM
AIR INTAKE
- BLEED valve 1 and 2
- FAN AIR VALVE 1 AND 2
- APU BLEED valve
- External group
- Cross BLEED valve
AIR CONDITIONING CIRCUIT
- PACK 1 and 2
- HEAT EXCHANGER 1 and 2
- COMPRESSOR 1 and 2
- AIR distribution
AIR PRESSURIZATION
- OUTFLOW valve
- Pressurization profile
SYSTEM SUPERVISION SIMULATIONS
STATUS
- Park
- Airport service support
- APU bleed
- PACK 1 and 2
- Engine starting
- Pressurization cycle
AIR MANAGEMENT PROBLEMS HANDLING
TECHNICAL SPECIFICATIONS
The system is arranged on a silk-screen, panel provided with:
• Color silk screen panel
• Selection of the operational conditions with switches and pushbuttons
• Displays and LED visualisation
• Dynamic display of the parameters, on the computer screen,
with high graphic performance software (LabVIEW)
• USB connexion with the computer
Power supply: 230 Vca 50 Hz single-phase - 50 VA(Other voltage and frequency on request)